Projects


Utilities Planning and Design


Sewer Replacement Program

2/26/14

Location: Bellingham, WA Owner: City of Bellingham Each winter, the City of Bellingham dedicates $2 million to design and construct several miles of sewer pipe replacement. Using the City of Bellingham’s asset management software, the pipes were identified as deficient and in need of replacement. OCI was responsible for reviewing CCTV videos and inspection reports,
( Read more... )

South Link SeaTac/Airport Station to S 200th St. Design Build Project

2/25/14

Location: SeaTac, WAOwner: Sound Transit OCI assisted the PCL/HDR team with permitting, design, and construction of 1.6 miles of double-track Light Rail Transit (LRT) elevated line between the SeaTac/Airport Station and S 200th St. The project included a track guideway, a terminal station at the intersection of S 200th St. and 28th Ave. S, site work,
( Read more... )