Fish Passage and Habitat Restoration


Projects


NE 192nd Street Culvert Replacement

12/15/17

Location: Kenmore, WA Owner: City of Kenmore OCI completed the alternatives analysis design and construction documents (PS&E) for a 60-foot long 12-foot by 7-foot bottomless precast culvert for Little Swamp Creek at the NE 192nd Street crossing in Kenmore, WA. The culvert will relieve persistent flooding and meets WDFW fish passage standards. The project includes:
( Read more... )

OCI Designs SDOT Neighborhood Street Fund Projects

8/23/16

This summer, OCI developed conceptual designs for Seattle’s Department of Transportation’s annual Neighborhood Street Fund Program, recently covered by King 5 News. OCI provided concept-level designs for 20 Neighborhood Street Fund projects. The projects range from sidewalk improvements, new roundabouts, signal upgrades, and more. Working from applications provided by community members detailing problem areas and
( Read more... )

Water Line Removal

2/26/14

Location: Bellevue, WA OCI was responsible for the removal of an asbestos concrete waterline suspended 5 feet above Kelsey Creek. The design required coordination with the fish window, evaluation of impacts to the stream, and addressing limited access to the site. OCI performed site visits, completed the design for the removal and streambank restoration, and
( Read more... )

Kelsey Creek at NE 8th Street Fish Passage Culvert Improvements

2/25/14

Location: Bellevue, WA Owner: City of Bellevue OCI was selected by the City of Bellevue as the prime consultant to complete full plans, specifications and engineer’s estimate of the proposed fish passage improvements within Kelsey Creek at the NE 8th Street culvert. The OCI team was responsible for the data collection and site reconnaissance, the
( Read more... )