Education


Projects


Chief Leschi High School Sports Fields

5/6/20

Location: Puyallup, WAOwner: Puyallup Tribe This new athletic field complex for the Puyallup Tribe was designed to reflect the radial pattern of the existing high school facility and provide views of Mt Rainier. Elements include a synthetic turf football field with rubberized track and 888-seat grandstand with locker rooms, a new softball field with synthetic
( Read more... )

Puyallup River Bridge Replacement Timelapse

8/24/15

Last weekend, the 379-ton, steel truss bridge, originally built in 1925 and most recently used as temporary detour bridge across Puyallup River, was moved away from the river and onto WSDOT right-of-way. OCI worked on the drainage design for the temporary detour and the permanent bridge, designed a bioswale to  treat the added PGIS, and
( Read more... )

SR 167 Puyallup River Bridge

2/25/14

Location: Puyallup, WAOwner: City of Puyallup OCI was responsible for drainage and TESC design for temporary detour and permanent bridge across Puyallup River at the outer limits of City of Puyallup from Milepost 6.19 to 6.25. The project involved removing the existing degraded southbound steel truss bridge (Meridian Street Bridge) and replacing it with a
( Read more... )