Recent News


OCI Takes to the Green for ASCE Golf

8/23/17

OCI Project Manager Ann Bryant took to the green last Friday (August 18, 2017) to form “The Dream Team” at ASCE Seattle’s annual golf tournament. The Dream Team was the only all-female team to compete in the tournament and had a great time playing together. Thanks to the ASCE Seattle Section for putting on such
( Read more... )

SPU Modeling On-Call

12/13/16

Location: Seattle, WAOwner: Seattle Public Utilities OCI is a key subconsultant on this modeling on-call contract led by Aqualyze. OCI and Aqualyze team members are working together to update and calibrate system wide sewer models as well as drainage basin models to provide SPU with a much needed tool to address and analyze system capacity issues
( Read more... )

Lower Taylor Creek Culvert Replacement and Habitat Improvement Project

2/25/14

Location: Seattle, WAOwner: Seattle Public Utilities OCI performed the Lower Taylor Creek analysis of alternatives for Seattle Public Utilities to improve fish passage, alleviate flooding, and stabilize the stream system. The project began with OCI leading a brainstorming session where OCI, Seattle Public Utilities, and Project Stakeholders identified alternatives and assessed the triple bottom line
( Read more... )

Venema Natural Drainage System

2/25/14

Location: Seattle, WAOwner: Seattle Public Utilities OCI was the prime for the award-winning Venema Natural Drainage System project. The design project retrofitted six residential city blocks with roadside bio-retention cells and underground injection control wells (UICs) providing water quality treatment, infiltrating runoff from the street, and reducing runoff peak flow and volume. As all the construction
( Read more... )