SR 167 Puyallup River Bridge
2/25/14Location: Puyallup, WAOwner: City of Puyallup OCI was responsible for drainage and TESC design for temporary detour and permanent bridge across Puyallup River at the outer limits of City of Puyallup from Milepost 6.19 to 6.25. The project involved removing the existing degraded southbound steel truss bridge (Meridian Street Bridge) and replacing it with a
( Read more... )