Recent News


2021 Osborn Consulting Scholarship

4/9/21

Osborn Consulting is excited to be offering a scholarship this year through the Renton Regional Community Foundation for upcoming professionals in our industry. The Osborn Consulting Scholarship is for ambitious BIPOC students with demonstrated financial need who are or will be pursuing a bachelor’s or master’s degree at accredited programs in landscape architecture or civil
( Read more... )

Spokane Administrative Assistant

9/17/20

Administrative Assistant Location: Spokane, WA. Come join our team as a part time Administrative Assistant! Osborn Consulting, Inc. (OCI) is a fast-growing full-service design firm providing civil engineering, landscape architecture, and urban design. From conceptual planning through design plans, specifications, and estimates (PS&E) and construction support, we provide a range of services for all phases
( Read more... )

Osborn Consulting’s Spokane Office is Now Open!

7/1/19

Osborn Consulting is excited to announce the opening of our Spokane office! Located in the heart of downtown Spokane, our newest office allows Eastern Washington clients and teaming partners easy access to our team members and resources. Our Spokane office is currently staffed with three exceptional engineers. Aimee Navickis-Brasch, PhD, PE, is a recognized leader
( Read more... )

North Creek Interceptor and Olympus Meadows Trunk Sewer Capacity Improvements CM Project – North and South Segments

3/17/14

Location: Alderwood, WA OCI was in-charge of conducting field inspections to ensure that all temporary erosion and sediment control BMPs are properly installed and functioning at the project sites. As part of the field inspection, OCI CESCL Inspectors collected water samples and analyzed it for turbidity and pH and prepared field notes and field directives for
( Read more... )

Water Line Removal

2/26/14

Location: Bellevue, WA OCI was responsible for the removal of an asbestos concrete waterline suspended 5 feet above Kelsey Creek. The design required coordination with the fish window, evaluation of impacts to the stream, and addressing limited access to the site. OCI performed site visits, completed the design for the removal and streambank restoration, and
( Read more... )